top of page
Sanding and Refinishing with Chêne Fumé "Zero VOC Oil"

Sanding and Refinishing with Chêne Fumé "Zero VOC Oil"

$8.50Price

Please Note Pricing is Per Square Foot.  There is a $2,500 Minimum in NJ & $3,500 Minimum in NY for Sanding and Finishing.  Please scroll to view additional Job Prep, Disposal and Repair Fees. 

 

Sanding and Finishing Platinum Package 

Family Favorite: Eco-Friendly, 0-VOC 

50% Choose 

  • Sand Floors Bare, restore to new-like condition 

  • Choose Color Stain from Platinum Package  

  • Eco-friendly, Zero VOC 

  • Hard wax oils, natural oils & water base, the world's most eco-friendly products 

  • Imported from Italy & Belgium 

 

0% Volatile Organic Compounds (VOC), nor does it contain other harmful chemicals 

 

40 colors of oil which may be combined or used in combination with pre-treatments for unlimited choice. Natural solution for protecting and enhancing the appearance of wood in one layer. The natural ingredients on which the oils are based generate a molecular reaction with the exposed cellulose fibers of the wood. The surface will be touch dry within minutes, moisture resistant within 48 hours and will be fully cured within 6 days of application. Please avoid wet cleaning during the curing period.  

 

PROTECTS AND COLORS WOOD IN ONE LAYER  

 

Contains 0% VOC, does not contain any water or solvents. This is a 2-component oil finishing system, consisting of Oil Plus (A) and Accelerator (B) that is very suitable for indoor applications which require quick curing. Oil Plus 2C is applied in one layer and cures in 7 days. Oil Plus 2C is also available as Part A only, without the accelerator part B. 

 

Please note the price per square foot does not include Job Preparation Costs which range from $500-$2000 in NJ and $1000-$3000 in NY, nor does it include cost of disposal which ranges from $200-$1000 in NJ and $500-$2000 in NY. Additionally, repairs are not included in this price. After submittal of purchase order, we will contact you to create a finalized estimate including the costs of these items based on the size and location of your project. 

    bottom of page